{"id":901554,"date":"2022-09-12T12:51:11","date_gmt":"2022-09-12T12:51:11","guid":{"rendered":"https:\/\/revismo.webme.ee\/revismo-inseneride-huvitav-too-kontsertlava-projekteerimine-ja-tugevusarvutused\/"},"modified":"2026-09-09T07:17:40","modified_gmt":"2026-09-09T07:17:40","slug":"revismo-inseneride-huvitav-too-kontsertlava-projekteerimine-ja-tugevusarvutused","status":"publish","type":"post","link":"https:\/\/revismo.com\/en\/revismo-inseneride-huvitav-too-kontsertlava-projekteerimine-ja-tugevusarvutused\/","title":{"rendered":"Interesting work by Revismo engineers \u2013 concert stage engineering and strength calculations"},"content":{"rendered":"\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/revismo.com\/wp-content\/uploads\/2022\/09\/Revismo-Engineering-kontsertlava-tugevusarvutused-2.jpg\" alt=\"Revismo-Engineering-tugevusarvutused-insenertehnilised-lahendused-www.revismo.com\"\/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/revismo.com\/wp-content\/uploads\/2022\/09\/Revismo-Engineering-kontsertlava-tugevusarvutused-1.jpg\" alt=\"Revismo-Engineering-tugevusarvutused-insenertehnilised-lahendused-www.revismo.com\"\/><\/figure>\n<\/figure>\n\n<h2 class=\"wp-block-heading\">The Revismo team had the opportunity to create the technical solution for a concert stage.<\/h2>\n\n<p class=\"wp-block-paragraph\">The client wanted a modular load-bearing structure for a concert stage that could be dismantled and transported with little effort. The Revismo team developed the concept and carried out the engineering work. The size of the concert stage can be changed as needed by using a larger or smaller number of modules.<\/p>\n\n<h3 class=\"wp-block-heading\">Strength calculations<\/h3>\n\n<p class=\"wp-block-paragraph\">Comment from <strong>Chief Engineer Mirko Arras<\/strong>: \u201cThe biggest challenge was<strong> carrying out the strength calculations<\/strong>, because the safety of people is critically important here. The wind and snow loads acting on the stage are very high, so the engineering calculations had to be approached differently from usual.\u201d<\/p>\n\n<p class=\"wp-block-paragraph\">The stage is used for large concerts and other events. In its maximum configuration it is the largest relocatable concert stage in Estonia. It is used where an event has to be held in a place with no existing stage, or where the existing stage is too small or does not have sufficient technical capability. For the stage owner, the advantage is that if an event does not require the full-size stage, it can also be set up in a smaller configuration, which is more cost-effective (shorter set-up and take-down time). The entire stage can be packed into truck trailers. Transporting the stage in its maximum configuration requires 5 trailers, each 13 metres long.<\/p>\n\n<h3 class=\"wp-block-heading\">Standards used in the project:<\/h3>\n\n<figure class=\"wp-block-table\"><table>\n<tbody>\n<tr>\n<td>EN 1990 Eurocode<\/td>\n<td>Basis of structural design<\/td>\n<\/tr>\n<tr>\n<td>EN 1991 Eurocode 1<\/td>\n<td><a href=\"https:\/\/www.evs.ee\/et\/evs-en-1991-1-3-2006-a1-2016\" rel=\"noopener noreferrer\" target=\"_blank\">Actions on structures<\/a><\/td>\n<\/tr>\n<tr>\n<td>EN 1993 Eurocode 3<\/td>\n<td><a href=\"https:\/\/www.evs.ee\/et\/evs-en-1993-1-1-2005\" rel=\"noopener noreferrer\" target=\"_blank\">Design of steel structures<\/a><\/td>\n<\/tr>\n<tr>\n<td>EN 1090-1:2009<\/td>\n<td>Execution of steel structures and aluminium structures. Part 1: Requirements for conformity assessment of structural components<\/td>\n<\/tr>\n<tr>\n<td>EN 1090-2:2018<\/td>\n<td>Execution of steel structures and aluminium structures. Part 2: Technical requirements for steel structures<\/td>\n<\/tr>\n<tr>\n<td>EN 1090-3:2019<\/td>\n<td>Execution of steel structures and aluminium structures. Part 3: Technical requirements for aluminium structures<\/td>\n<\/tr>\n<tr>\n<td>Regulation No 305\/2011<\/td>\n<td>Construction Products Regulation<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n<h3 class=\"wp-block-heading\">Work carried out by the Revismo team during this project:<\/h3>\n\n<ul class=\"wp-block-list\">\n<li>3D CAD modelling<\/li>\n\n\n<li>Review of standards<\/li>\n\n\n<li>Strength analyses<\/li>\n\n\n<li>Engineering calculations<\/li>\n\n\n<li>Selection of manufacturing technology<\/li>\n\n\n<li>Preparation of production drawings<\/li>\n\n\n<li>Preparation of the user and maintenance manual<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">The total volume of development work was approximately 320 hours.<\/p>\n\n<h3 class=\"wp-block-heading\">The Revismo team<\/h3>\n\n<p class=\"wp-block-paragraph\">The following people from <a href=\"https:\/\/revismo.com\/insenerid\/\" rel=\"noopener noreferrer\" target=\"_blank\">the Revismo team<\/a> took part in the project:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Chief Engineer Mirko Arras<\/li>\n\n\n<li>Deputy Chief Engineer Kristjan Kuningas<\/li>\n\n\n<li>Sales Engineer Erki Pellja<\/li>\n\n\n<li>Managing Director Kristo Klementi<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Revismo team had the opportunity to create the technical solution for a concert stage. The client wanted a modular load-bearing structure for a concert stage that could be dismantled and transported with little effort. The Revismo team developed the concept and carried out the engineering work. The size of the concert stage can be [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":901555,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[18],"tags":[],"class_list":["post-901554","post","type-post","status-publish","format-standard","has-post-thumbnail","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/posts\/901554","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/comments?post=901554"}],"version-history":[{"count":5,"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/posts\/901554\/revisions"}],"predecessor-version":[{"id":901687,"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/posts\/901554\/revisions\/901687"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/media\/901555"}],"wp:attachment":[{"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/media?parent=901554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/categories?post=901554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/revismo.com\/en\/wp-json\/wp\/v2\/tags?post=901554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}