From 01.06.2020 till 09.10.2020 Revismo Engineering was involved in the development and design of thermal power plant equipment.
The power plant machinery is located in Central Europe and the main purpose of this machinery is transport construction waste, consisting mainly of recycled wood.
Revismo team did detailed production drawings, strength calculations, productivity calculations and compiled a detailed 3D CAD model.
In addition to the work above, our team also compiled manuals for use, maintenance, installation and lifting.
The total number of design and development hours was 730 during a 4 month period.